
Energy and industrial technology · Abu Dhabi
Exhibition stand builder for ADIPEC 2026 in Abu Dhabi.
Exhibiting at ADIPEC 2026? Custom exhibition stands for energy, oil and gas companies, designed, built and installed by our own team.
Plan your standPhotographed at the show
Selected ADIPEC projects.
Several stands are built at ADIPEC every year. These are the projects we can publish photography for; each one opens its own case study.
ADIPEC · 2024 · 80 m²Perm
Compact, premium, and laid out to be crossed in one pass.
ADIPEC · 2022 · 200 m²Wintershall
Technical talk, hospitality and heavy footfall on one floor.
ADIPEC · 2025Gazprom
A blue architectural system built to read the length of the hall.
ADIPEC · 2023Perm Region
A regional industrial story given architectural form.
ADIPEC · 2025 · 90 m²Perm
The black-and-gold language opened out into a visitor-ready floor.
ADIPEC · 2022 · 70 m²Perm Region
Five member companies under one mark, each keeping its own.
Design for the conversation that matters
What an ADIPEC stand has to do.
ADIPEC is a delegation market, not a trading floor. Business happens in scheduled meetings with national oil companies, contractors and government delegations, so an ADIPEC stand has to carry technical authority, hospitality and private meeting capacity at once. We design and build custom exhibition stands for that brief — structure, AV, meeting rooms, hospitality and venue approvals as one delivery line, and the energy exhibition stands we build here are meeting venues first.
Read more
Our role is to make the creative ambition buildable, approvable and operational before the venue clock becomes expensive.
- 01High-capacity meeting and hospitality planning
- 02Large-format media and technical storytelling
- 03Engineering, production and ADNEC coordination
- 04On-site delivery and live-show support
About the show
What is ADIPEC 2026?
ADIPEC — the Abu Dhabi International Petroleum Exhibition and Conference — is what its organiser calls the world’s largest energy exhibition and conference. It is organised by dmg events, hosted by ADNOC, and held at ADNEC Centre Abu Dhabi, with more than 239,000 attendees, 2,250 exhibiting companies and delegations from 172 countries at its 2025 edition. ADIPEC 2026 runs 2–5 November.
- Dates
- 2–5 November 2026
- Venue
- ADNEC Centre Abu Dhabi
- Organiser
- dmg events
- Host
- ADNOC
- Exhibition attendees
- 239,000+
- Exhibiting companies
- 2,250+
- Countries represented, 2025
- 172
- Conference speakers
- 1,800+
Who exhibits at ADIPEC
National and international oil companies, energy majors, EPC and engineering contractors, oilfield services and equipment makers, decarbonisation, hydrogen and digital suppliers, and national pavilions grouping a country’s energy sector. The large exhibitors build custom exhibition stands, many of them double-deck, because meeting capacity is what the floor is short of.
Who attends
Ministers and government delegations, NOC and IOC executives, procurement and engineering teams, investors and contractors from the GCC, Asia, Europe and Africa. Most arrive with meetings booked, so the stand works as a meeting venue first — which is why exhibitors look for an approved exhibition stand contractor at ADNEC Centre Abu Dhabi who has built at this show before.
Before you appoint anyone
Questions exhibitors ask about ADIPEC.
Has Beauty Sky built exhibition stands at ADIPEC before?
Yes. Perm Region, Wintershall and Gazprom are among the exhibitors we have built for at ADIPEC. Selected projects are shown on this page with photographs.
When and where is ADIPEC 2026?
ADIPEC Abu Dhabi runs 2–5 November 2026 at ADNEC Centre Abu Dhabi, Abu Dhabi. Confirm build-up and breakdown times in the organiser's exhibitor manual, which sets the real deadline for a custom stand.
Shell scheme, single deck or double-deck at ADIPEC?
A shell-scheme booth comes with the space and suits a first-time or small exhibitor. Most established energy exhibitors take a custom single-deck stand. A double-deck adds an upper floor of meeting rooms and hospitality on the same footprint, which is why it is common at ADIPEC, but its structure goes to ADNEC for approval before fabrication, so it needs a longer lead time than the ten to twelve weeks a single-deck stand design needs.
What does a stand at ADIPEC cost?
Beauty Sky quotes custom exhibition stands in Dubai from AED 1,000 per square metre, on a minimum stand size of 24 m². What moves the figure is structure, AV and finishes rather than floor area alone, so ask any builder for a line-by-line quotation that separates AV and rigging from the build, and check what the organiser bills you directly for space, power and rigging points.
More questions (7)
What does an ADIPEC stand contractor actually handle?
Spatial planning, technical drawings and the structural calculations ADNEC requires, fabrication, rigging and power requests, installation inside the build-up window, show-day support and dismantling. Beauty Sky runs all of it with one team, so an approved drawing and the stand that opens are the same object rather than a handover between suppliers.
How does ADIPEC stand design differ from a consumer show?
ADIPEC is a delegation market rather than a trading floor. Business happens in scheduled meetings, so the ratio of private to open space runs higher and the structures are heavier than at a Dubai consumer show of the same size. On the larger stands most of the floor is meeting capacity.
Is Beauty Sky an approved exhibition stand contractor at ADNEC?
Yes. Beauty Sky is an approved exhibition stand contractor at ADNEC Centre Abu Dhabi, and has built there for Gazprom, Wintershall and Perm Region. Production runs from our own facility in Al Quoz, so the transport to Abu Dhabi sits inside our schedule rather than being handed to a local subcontractor on arrival.
Do you build country pavilions at ADIPEC?
Yes. We design and build country pavilions and national pavilions for ministries, trade agencies and pavilion organisers, and we can do the same at ADIPEC. Each gives a country one identity, with a space for every exhibiting company, shared meeting space and one contractor from design to handover.
How early should we appoint a stand builder for ADIPEC?
Ten to twelve weeks before the show for a custom build, and earlier if the stand carries a double deck or heavy structure, because those go to the venue for structural approval first. The sequence is brief, concept, 3D sign-off, technical drawings, venue submission, fabrication, then build-up at ADNEC Centre Abu Dhabi. Workshop capacity in Dubai fills before the organiser's technical deadline does, so the deadline that matters is not the one in the exhibitor manual.
Can Beauty Sky manage design, production and installation in Abu Dhabi?
Yes. Beauty Sky coordinates the full delivery line from concept and technical development through fabrication, venue installation, opening-day readiness and handover in Abu Dhabi.
What should we send for an initial proposal?
Share the stand location and size, organizer manual, brand objectives, required spaces, product or demonstration needs, target budget and decision timeline.
The next horizon
Planning an exhibition stand? Bring us the brief.
The first concept and 3D design are free. Send the show, the stand size and what it has to do.
Bring us the brief